

When it comes to rapid deployment and reliable water treatment at remote or temporary sites, our Integrated Containerized Units are engineered to deliver complete process capability within a standard ISO shipping container. With a focus on factory-tested integration, plug-and-play installation, and unattended operation, we offer a comprehensive range of containerized treatment plants to suit municipal, industrial, and emergency water supply applications.
JX Filtration offers a full range of integrated containerized units from compact 10-foot skids to complete 40-foot plants, with flexible customization options to suit various flow rates and water qualities across municipal, industrial, mining, and emergency response applications—pre-assembled, factory-tested, and ready for rapid on-site commissioning.
An integrated containerized unit, also known as a containerized water treatment plant or packaged treatment system, is a self-contained process facility built inside a standard ISO shipping container. The container serves as the building, the transport frame, and the equipment skid all at once. The full process train—including pretreatment, filtration or membrane separation, disinfection, and power/control systems—is integrated, piped, wired, and tested in the workshop before dispatch. At site, the unit is craned onto a simple pad, connected to feed, discharge, and power, and commissioned in days rather than the months required for a conventional civil-built plant.



Container Shell: Standard 10′, 20′, and 40′ ISO containers, insulated, dust-sealed, and available with salt-air-rated, tropicalised, or arctic-hardened finishes.
Process Piping: Stainless steel 304/316L, PVC, or FRP as required by process fluid.
Tanks & Vessels: 304/316 stainless steel, FRP, or carbon steel with internal anti-corrosion lining.
Membrane Elements (if applicable): PVDF, PES, or ceramic UF membranes; polyamide composite RO membranes.
Pumps: Grundfos CR series multistage centrifugal, or equivalent, for feed, backwash, and chemical cleaning duties.
Control System: PLC/SCADA with touch panel HMI, remote telemetry (satellite or cellular), and automated backwash/fault recovery sequences.
Power Supply: 380V/50Hz 3-phase standard; on-board diesel, solar-battery hybrid, or fuel-cell power available for off-grid operation.
Flow Capacity: 1 – 1,000 m³/h depending on process train and container size.
Container Sizes: 10′, 20′, 40′ ISO standard.
Commissioning Time: 2 – 14 days on site, compared to months for conventional civil construction.
Spares Kit: On-board 6–12 month spares kit available with swap-out maintenance philosophy.
World-wide project track record, continuously creating value for clients


Australia
New Zealand
Chile
Argentina
Ecuador
Colombia
Brazil
Peru
US
Canada
Mexico
Guatemala
Costa Rica
Norway
Spain
Germany
UK
Poland
Russia
Italy
Ukraine
Denmark
India
Indonesia
Malaysia
Thailand
Mongolia
Singapore
Zambia
South Africa
Egypt
Morocco
Algeria
UAE
Saudi Arabia
Israel
Syria
IraqHow can we continuously help you create value?
Something went wrong
You can also send your inquiry directly by email:grace@filtrationchina.com